Spela Goricki

Spela Goricki

Slovenia

Scriptorium biologorum

More

Published on May 21, 2022

Welcome to the second phase of our investigations into the dynamics of eDNA release rate by Proteus!

Welcome to the second phase of our investigations into the dynamics of eDNA release rate by Proteus!Since the results of the two analyses carried out in 2017 and 2018 were promising, but inconclusi...

Group 6 Copy 295
Published on Dec 24, 2018

Green Christmas

Dear backers,There has been a lot of excitement in our team over the past week, and now I would like to invite you to participate. No, this is not about https://garfield.com/comic/2010/12/25. The r...

Group 6 Copy 296
Published on Sep 03, 2018

A prestigious nomination

Dear eProteus backers, This will be my last update on the first phase of the project, which has been completed with the help of your donations. For this occasion I chose to post a piece of extraor...

Group 6 Copy 240
Published on Sep 03, 2018

Je ne sais pas si je peux, mais je vais essayer!*

* R. Goscinny & A. Uderzo (1965): Asterix chez les Bretons, pl. 43Dear Backers,Thanks to your interest and generous donations, it looks like I will be able to complete the first phase of brain ...

Backers Only
Group 6 Copy 47
Published on Aug 30, 2018

eDNA in Subterranean Biology Update

At the 23rd International Conference on Subterranean Biology two years ago I presented the results of a survey that introduced the eDNA method in the subterranean environment. Since then it is poss...

Group 6 Copy 246
Published on Aug 15, 2018

Brains, anyone?

I am writing this progress report in humble recognition of the donation by an anonymous backer.Last Tuesday we ablated the neural complex of 72 Ciona adults of various sizes, which have been left t...

Group 6 Copy 237
Published on Jun 06, 2018

The Mystery of the Missing Molecule

Dear eProteus fans,It is with great satisfaction that I announce the outcomes of our little proof-of-concept experiment. Given that over a year has elapsed since I wrote the last note, and that the...

Group 6 Copy 316
Published on Apr 15, 2017

Field work successful

Four days, seven people, five sampling sites. Water level 78-80 cm, flow rate 2.38-2.64 m3/s, temperature 8.6-9 degrees Celsius at Malni station and 96-102 cm, 12.0-15.1 degrees Celsius at Postojns...

Group 6 Copy 263
Published on Apr 14, 2017

Field work days 1 and 2

Group 6 Copy 226
Show more updates